Construction Update
Sabal Palm Tower
* 95% of the garage slab has been poured.
* All the masonry work has been completed, including public areas and rough casting of the walls.
* The rough casting and rendering of the external walls arecomplete, and the installation of the roof molding is completed.
* Trimming details are being installed around the balconies and windows, to include sills, and balustrades to the upper floors.
* Exterior finishing has been started.
_lowres.jpg)
* Installation of plumbing is completed on all floors as is the fire alarm system.
* The low voltage contractor has commenced the pulling of the data cable, etc.
* The lighting protection for the building is completely installed.
* The closing of the first floor unit walls and lobby has commenced.
* The second floor units have been locked, as final finish work is wrapping up. Including the installation of furniture. Floors 3 - 5 are also locked, just waiting on furniture and appliances to be installed.
* The podium slab is completely poured.
* The elevator installation has commenced, with the installation of the service elevator, doors have been installed from the second floor to the 12th floor.
Silver Palm Tower
* All masonry work is completed from the 1st - 12th floors. The rough casting and rendering of the external surface is 95 % completed.
* The installation of the moldings and trims for the external of the building and the balconies has commenced and external painting has started on the 12th floor.
* MEP work is currently in full progress and MEP works on floors 2-12 has been completed, allowing the FF&E crew to commence the closing of the units.
* Installation of tiling is complete on the balconies from the 2nd - 8th floors.
* The podium slab is 90% complete except for the area where the hoist elevators are in place.
* The installation of the service elevator has commenced.
Sentry Palm Tower
* All concrete work is finished.
* The roof contractor is in the process of installing the roof, which will be completed by the end of August.
* The fitness center size/layout is finalized and finalization of the specification and finishes for the gym equipment is in progress.
Villa 11
* The furnishing and hardware have been installed, including some appliances.
* We have completed the installation of the balcony railings.
* The landscaping and hardscaping are 95% completed around villa 11.
lowres.jpg)
Villa 1 - 4
* Concrete pour to spread footing foundations has taken place.
* Rebars have been installed for first floor slabs, beams, shear walls and columns.
Villa 5 - 10
* 95% of the exterior rendering of the walls is completed. The roofs are complete.
* The basements of villa 7 - 10 have been completely backfilled for the slab.
* Studs and partition works in all four villas have commenced.
* The MEP is currently in progress in all units.
Clubhouse
* Layout and stud work has commenced. The studs and dry wall installation are completed on the second and third floor and are progressing on the first floor.
* Roof installation has commenced for the western section of the clubhouse. The roof shingles installation has commenced.
* The MEP crew is in the process of pre-cleaning the conduit on the 1st and 2nd floors for installation. Installation of mechanical system and plumbing for the building has commenced.
* The backfilling of the clubhouse has commenced.
ESPA
* The roof has been completed.
* The windows frames have been installed and grouted.
* The first floor and second floor have been completely studded, awaiting the completion of the MEP works. The MEP crew is currently working on all the areas of the SPA.
* Cold and Warm pools structures are being put in place, including all items supplied by Deckelmann.
* Plumbing is commencing for the Lily pond.

Pools
* The Sentry pool concrete pour of pool walls and base slab is completed.
* The backfilling of both Club House and Sentry Pools has begun.
* Work on the retaining wall just north of both pools has begun.
Palmyra Beach
* The revetment is 100% complete pending completion of steps. The steps at Sabal Palm are completed and the pool steps are in progress.

Co-Generation Building (Power Plant)
* The mansard roof is complete; the contractor is currently in the process of installing the plywood and roof eaves.
* They have commenced the installation of the roof insulation.
* The concrete contractor has completed 100% of the masonry walls for the building.
* The slab on grade for the floor is 98% complete.
* The LPG tanks have arrived on site and are ready for installation.
MEP = masonry, electric and plumbing work
FF&E = furniture, fixtures and equipment
Lester Scott Appointed GM for the Palmyra Resort & Spa, Rose Hall, Jamaica
Thursday, July 24, 2008
Luxury hotel industry veteran Lester Scott has been appointed to the position of General Manager of Solís The Palmyra Resort & Spa. In his role as General Manager, Mr. Scott will have direct oversight and management of all aspects of Jamaica's newest luxury resort.
Launched by legendary hotelier and former president of The Ritz-Carlton Hotel Company, Horst Schulze, Solís Resorts & Hotels is a new luxury hotel brand that includes a collection of resorts, hotels and residences offering a convergence of unparalleled designs, settings and experiences.
Celebration Jamaica
Buy today...and it becomes a part of something special tomorrow!

When you buy into The Palmyra Resort & Spa, you are buying into the beginning of something special. As an owner, you already know why you have purchased. You have bought a piece of the rock, a home away from home. Little did you know that this was just the beginning.
Situated on approximately one kilometer of beach front property in Rose Hall, Montego Bay, the US$1.8B "Celebration Jamaica" resort development will be the largest private investment ever made in Jamaica. Brought to life by the developers of the luxurious Palmyra Resort & Spa, the island's first casino hotel will form the cornerstone of a multilayered Resort & Casino development that will celebrate Jamaica through an array of premier attractions rivaling the world's best.
Located on the oceanfront directly across the street from three championship golf courses and less than a 15 minute drive from the Montego Bay Sangster International Airport, the location of the proposed mega development "Celebration Jamaica" is hard to rival. Anticipated to become a significant competitor to the world's most popular destination resorts, a total of 2,000 rooms are planned throughout the development in the form of a casino hotel and several luxury real estate components.
Said Robert T. Trotta, developer of The Palmyra Resort & Spa; "Celebration Jamaica will prove to be a ‘tipping point' for unprecedented growth in both tourism and property values in Jamaica. The next decade will come to be known in Jamaican history as the moment in time when Jamaica established itself as ‘The Tourist and Financial Capital of the Caribbean'."
As seen in the Jamaica Tourist Issue #9. Click here to view.
Need general information on Jamaica?
Go to www.jamaicatourist.net or pick up your free copy of the Jamaica Tourist at any of our over 270 island-wide distribution points.